Page 170 - Estudios Economicos
P. 170
I
I
I
I TABLA 900.9
COSTO DIRECTO DE LAS OBRAS DE RIEGO 2da. ETAPA
Desde Las Pavas y Arrazayal se riega el sector Aguas Blancas-Rio Pescado (Iado argentino).
I U S del 30-9-95 A PRECIOS DE MERCADO A PRECIOS ECONOMICOS
RUBRO
LAB P AIN his AIRIRAZP:NAIL LAIS P AIN AIS A!R!FUAZJJ:NAIL
1. MANO DE OBRA 1,772,308 1,063,385 1,234,235 740,541
80,179
in 1.1. Calificada 177,231 106,338 133,632 660,362
957,046
1,595,077
1,100,603
1.2. No calificada 5,316,923 3,190,154 4,100,411 2,460,247
2. MATERIALES
i 2.2. Importados 5,051,077 3,030,646 3,884,278 2,330,567
2.1. Nacionales
216,133
129,680
265,846
159,508
3. EQUIPOS DE CONSTRUCCION 4,430,769 2,658,462 3,498,535 2,099,121
3.1. Nacionales 2,658,462 1,595,077 2,057,649 1,234,590
3.2. Importados 1,772,308 1,063,385 1,440,886 864,532
+++:
4. EQUIPOS 1,280,000 768,000 1,011,456 606,874
4.1. Nacionales 768,000 460,800 595,200 357,120
I 4.2. Importados 12,800,000 7,680,000 9,844,638 5,906,783
416,256
307,200
249,754
512,000
TOTAL
i
I \515\ |,[L( 5p06 =
I `,,bo Sv/hal,
I
I
I
I
I
I
I
I
i++