Page 118 - Memoria de Diseños Preliminares
P. 118
I
I APROvECHAMIENTO ARnAZAyAL -550 ho|a 3 de 3
I COSTOS INDIRECTOS
B
I
I TOTAL COSTOS INDIRECTOS 20,052,195.60
COSTOS ACCESOS
E
I
++
TOTAL ACCESOS o.oo
I COSTOS FIJOS TOTAL AccEsOs c/FiEUBicAcioN nuTAs 7,000,000.00
I COSTOS INDIRECTOS
20,052,195.60
•;
0.00
TOTAL ACCESOS
I TOTAL ACCESOS C/REUBICACION RUTAS 7'000'000.00
TOTAL COSTOS FIJOS 20,052,195.60
I TOTAL COSTOS FIJOS C/REUBIC. I]UTAS 27,052,195.60
COSTO DE OBFIA
133,681 ,304.0020,052,195.60
1+;/
COSTOS DIFIECTOS
COSTOS FIJOS
TT 27,052,195.60
COSTOS FIJOS C/F]EUBICACION F]UTAS
TOTAL COSTO DE OBf]A 153,733,499.6o
E TOTAL cOsTO DE OBnA c/REUBic. RUTAs 1 60,733,499.60
I COSTO OBRAS DE RIEGO
ha 0.00
AFIEA BOLIVIA
I AnEA AnGENTiNA ha 30,000.00 0.00
COSTO OBRA DE RIEGO -CANAL kin 30.00 320'000.00 9'600,000.00
`h
+:+