Page 121 - Memoria de Diseños Preliminares
P. 121
I
ho|a 3 de 3
I Apf]OVECHAMIENTO ARRAZAYAL -550 (HORMIGON RCC)
COSTOS INDIRECTO§
I
I
Tj
TOTAL cOsTOs iNDmECTOs 13,861,827.45
+i+
COSTOS ACCESOS
I ACCESOS
.1 CAMINOS A CONSTRUIR kin 0.00
I 8.2 CAMINOS A MEJ0t]AF] kin 0.00
0.3 nEUBICAcioN DE nuTAs ExlsTENTEs kin 20.00 350,000.00 7,000'000.00
I TOTAL ACCESOS o.o0
TOTAL ACCESOS C/PIEUBICACION 7,0oo,0oo.oo
COSTOS FIJOS
I 13,861,827.450.007,000'000.00
COSTOS INDIF`ECTOS
I TOTAL ACCESOS
TOTAL AccEsos c/nEUBicAcioN RUTAs
I TOTAL COSTOS FIJOS 13,861,827.45
TOTAL COSTOS FIJOS C/F]EUBICAC. 20,861,827.45
I COSTO DE OBF]A
92,412,183.0013,861,827.4520,861,827.45
COSTOS DIRECTOS
I COSTOS FIJOS
COSTOS FIJOS C/REUBICACION f]UTAS
I TOTAL cOsTO DE OBnA 106,274,Oio.45
TOTAL cOsTO DE OBRA c/nEUBicAc. " 3,274,Oio.45
I I I COSTO OBFIAS DE FllEGO
ha 0.00
AREA BOLIVIA
I 0.00
AREA Af]GENTINA ha 30,000.00
I COSTO OBl]A DE RIEGO - CANAL kin 30.00 320,000.00 9,600,000.00
I
I