Page 124 - Memoria de Diseños Preliminares
P. 124
I
ho|a 3 de 3
APROVECHAMIENT0 CANDADO CHICO -448
+;
I COSTOS INDIRECTOS
I
E
I TOTAL COSTOS INDIRECTOS 7,870,140.45
COSTOS ACCESOS
E
+i+
I
TOTAL ACCESOS o.oo
I lcosTOSFIJOS TOTAL ACCESOS C/REUBICACION RUTAS 3,5oo,000.oo
7,870,140.45
COSTOS INDIRECTOS
H 0.00
TOTAL ACCESOS
3,500,000.00
TOTAL ACCESOS C/F]EUBICACION F]UTAS
1-
TOTAL COSTOS FIJOS 7,870,140.45
TOTAL COSTOS FIJOS C/l]EUBIC. F`UTAS 11,370,140.45
`+i
COSTO DE 0BF]A
I cOsTOs DmECTOs 52,467,603.007,870,140.45
•1 COSTOS FIJOS
11,370,140.45
COSTOS FIJOS C/PIEUBICACION RUTAS
TOTAL cOsTO DE OBnA 60,337,743.45
fi TOTAL cOsTO DE OBnA c/nEUBlc. nuTAs 63,837,743.45
cOsTO OBRAs DE niEGO
•t!
ha 0.00
Af]EA BOLIVIA
di AnEA ARGENTINA ha 30,000.00 0.00
COSTO 0BF)A DE F]lEGO -CANAL kin 20,00 323,700.00 6'474'000.00
in
I