Page 127 - Memoria de Diseños Preliminares
P. 127
I
i APROVECHAMIENTO CANDADO CHICO -448 (HORMIGON RCC) ho|a 3 de 3
t\ cOsTOs INDmECTOs
I
•+
I TOTAL cosTos iNDmECTos 7,297,008.75
COSTOS ACCESOS
E
i,i
I.
TOTAL ACCESOS o.oo
TOTAL ACCESOS C/I]EUBICACION I]UTAS 3,5o0,0oo.oo
I COSTOS FIJOS
;tt
E
TOTAL COSTOS FIJOS 7,297,008.75
TOTAL COSTOS FIJOS C/REUBIC. FIUTAS 10,797,008.75
1-
COST0 DE OBF]A
E cOsTOs DmECTOs 48,646,725.00
7,297,008.75
I COSTOS FIJOS 10,797,008.75
COSTOS FIJOS C/flEUBIC.RUTAS
E TOTAL COSTO DE 0BHA 55,943,733.75
TOTAL COSTO DE OBRA C/REUBIC. RUTAS 59,443,733.75
COSTO OBRAS DE FIIEGO
E
AREA BOLIVIA h8 0.00
I AI]EA AI]GENTINA ha 30,000.00 0.00
COSTO 0Bf]A DE f]lEGO -CANAL kin 20.00 323'700.00 6,474,000.00
I
I