Page 93 - Memoria de Diseños Preliminares
P. 93
I
hoja 2 de 3
APPIOVECHAMIENTO PAMPA GI]ANDE -770
•';
COSTOS DmECTOS (contlnuacl6n)
E
2 OBRAS ELECTPIOMECANICAS
I 2.1 GF]UPOS TUFtBOGENERADORES (2.1.1 a 2.1.4) 15,417,760.00
2.1.1 Turblnas
2.1.2 Generadores
I 2.1.3 Valvulas marlposa
Puente g'tla
2.1.4
2.1.5 Conductos foTzados 12'700.00 1,270,000.00
250,000.00
2.1.6 Atagulas tubo de asplracl6n 250,000.00 250,000.00
I 2.1.7 P6rtlco tubo de asplracl6n
250,000.00
2.2 TOMA 790'000.00
Compuertas
I 2.2.1 Atagufas 237,000.00
2.2.2
110'000.00
Flelas
2.2.3
2.2.4 portico toma 250,000.00
I 2.3 VEFtTEDEF]O
2.3.1 Compuertas + servomecanlsmos 455'000.00 2,730,000.00
2.3.2 Ataguias 428,000.00 856,000.00
I
TF]ANSMISION Y SUBE§TACIONES 8,875,000.00
I TFIANSFOFIMADol] SALIDA GENEFIADof] 1,500'000.00
EXPF]OPIACIONES
i, 1,976.00 197,600.00
AFIEA EN BOLIVIA
I APIEA EN ARGENTINA 0.00
TOTAL COSTOS DIFIECTOS 212,634,337.00