Page 94 - Memoria de Diseños Preliminares
P. 94
I
ho|a 3 de 3
APROvECHAMiENTO PAMPA GnANDE -770
+;i
•; COSTOS INDIRECTOS
H
•;+
I TOTAL COSTOS INDll]ECTOS 31,895,150.55
COSTOS ACCESOS
I
8 ACCESOS
I 8.1 cAMiNos A coNSTnum kin 36.00 350,000.00 12,600,000.00
8.2 CAMINOS A MEJOF]AF] kin 76.00 ZOO,000.00 15'200,000.00
i,
TOTAL ACCESOS 27,800,000.00
I COSTO§ FIJOS
cOsTOs iNDmECTOs 31,895,150.55
fi TOTAL ACCESOS 27,800'000.00
I TOTAL COSTOS FIJOS 59,695,150.55
COSTO DE OBPIA
i+i
COSTOS DIRECTOS 212,634,337.00
COSTOS FIJOS 59,695,150.55
i++
TOTAL COSTO DE OBRA 272,329,487.55
iT:
COSTO OBRAS DE RIEGO
n
APEA BOLIVIA ha 0.00
I AREA ARGENTINA ha 0.00
COSTO OBRA DE F]IEGO - CANAL kin 90.00 190'000.00 17,100,000.00
I (CANAL a = 4.5 m3/s)
•;i
I