Page 97 - Memoria de Diseños Preliminares
P. 97
ho|a 3 de 3
APROVECHAMIENTO PAMPA GRANDE -770 (HORMIGON RCC)
COSTOS INDlf]ECTOS
TOTAL COSITOS INDIFIECTOS 23,212,321.80
COSTOS ACCESOS
8 ACCE§OS
8.1 cIAMiNos A coN§TPIum kin 36.00 350'000.00 12'600,000.00
8.2 CAMINOS A MEJOF`AFl kin 76.00 200,000.00 15,200,000.00
TOTAL ACCESOS 27,800,000.00
COSTO§ FIJOS
23,212,321.80
COSTOS INDIRECTOS
TOTAL ACCESOS 27,800,000.00
TOTAL COSTOS FIJOS 51,012,321.80
COSTO DE OBF]A
COSTOS DIRECTOS 154,748,812.00
COSTO§ FIJOS 51,012,321.80
TOTAL COSTO DE OBRA 205,761,133.80
COSTO OBf]AS DE t]lEGO
AREA BOLIVIA ha 0.00
APIEA ARGENTINA ha 0.00
CO§TO OBPIA DE PllEGO - CANAL kin 90.00 190,000.00 17,100,000.00
(CANAL a = 4.5 m3/s)