Page 50 - Rehabilitación de paleocauces Municipio de Villamontes
P. 50

REHABILITACION DE PALEOCAUCES MUNICIPIO DE VILLAMONTES DEPARTAMENTO DE TARIJA
                                                                                       OFICINA TECNICA NACIONAL DE LOS RIOS PILCOMAYO Y BERMEJO



                      M07 - INSTALACION AGUA POTABLE                                              4,185.96
                    1  EXCAVACION 0-2M SUELO SEMIDURO MANUAL      m³           2.06      61.88     127.47
                    2  PROV. Y TEN TUB PVC D=1/2" E-40             m           39.60     16.73     662.51
                    3  CLORADOR COMPLETO ENV.PLAST + ACCESORIOS   pza          1.00    1,084.15   1,084.15
                    4  CAMARA DE LLAVES                           pza          1.00     536.98     536.98
                    5  ACCESORIOS AGUA POTABLE                    gbl          1.00    1,530.50   1,530.50
                    6  CAMA DE ARENA E=10CM                       m³           0.92     154.78     142.40
                    7  RELLENO Y COMPACTADO                       m³           1.14      42.18      48.09
                    8  PRUEBA HIDRAULICA                           m           39.60      0.81      32.08
                    9  DESINFECCION DE TUBERIAS (HASTA D=4")       m           39.60      0.55      21.78
                      M08 - INSTALACION SANITARIA                                                 23,116.96
                    1  EXCAVACION 0-2M SUELO SEMIDURO MANUAL      m³           10.36     61.88     641.08
                    2  PROV. Y TENDIDO TUBERIA SDR-35 D=2"         m           21.45     46.75    1,002.79
                    3  PROV. Y TENDIDO TUBERIA SDR-35 D=4"         m           8.40      87.78     737.35
                    4  PROV. Y TENDIDO TUBERIA SDR-35 D=6"         m           18.10    171.40    3,102.34
                    5  HORMIGON CICLOPEO ( 1:2:3 - 50% P.D.)      m³           2.39     796.41    1,903.42
                    6  MORTERO IMPERMEABILIZANTE C/SIKA 4A        m²           12.30     31.84     391.63
                    7  TAPA DE HºAº Fck=250kg/cm2                 m³           0.25    2,987.53    746.88
                    8  PROV Y COLOC INODORO TANQUE BAJO + ACCES   pza          1.00     870.18     870.18
                    9  PROV Y COL LAVAMANOS PEDESTAL C/REB + GRIF+ ACCES  pza  1.00     996.96     996.96
                   10 PROV Y COL LAVAPLATOS C/REBALSE (2dep+1freg)+ACCES  pza  3.00    1,401.92   4,205.76
                   11 PROV Y COLOC DE DUCHAS + ACCES              pza          1.00     722.24     722.24
                   12 PROV. Y COLOC. REJILLA DE PISO 2"           pza          4.00     106.30     425.20
                   13 PROV Y COLOC CAJA  INTERCEPTORA 2"          pza          3.00      78.56     235.68
                   14 PROV Y COLOC DE PAPELERO                    pza          1.00      63.51      63.51
                   15 PROV Y COLOC DE JABONERO                    pza          5.00      53.31     266.55
                   16 PROV Y COLOC DE TOALLERO                    pza          5.00      59.67     298.35
                   17 CAMA DE ARENA E=10CM                        m³           1.39     154.78     215.14
                   18 RELLENO Y COMPACTADO                        m³           8.96      42.18     377.93
                   19 PRUEBA HIDRAULICA                            m           47.95      0.81      38.84
                   20 ACCESORIOS INSTALACION SANITARIA            gbl          1.00    5,875.13   5,875.13
                      M09 - INSTALACION ELECTRICA Y AIRE ACONDICIONADO                           171,202.09
                    1  PROV. INST. GENERADOR 3F A DIESEL DE 32KVA 380/220V  pza  1.00  65,342.37  65,342.37
                    2  PROV. INST. TABLERO DE MEDICION TRIFASICO  pza          1.00    3,621.26   3,621.26
                    3  PROV. INST. TABLERO GENERAL                pza          1.00    4,032.45   4,032.45
                    4  PROV. INST. TABLERO DE DISTRIBUCION        pza          1.00    2,557.59   2,557.59
                    5  PROV. INST. TABLERO SECUNDARIO             pza          3.00    2,470.71   7,412.13
                    6  INSTALACIÓN Y PROV. ILUMINACIÓN PUNTO      pto          24.00    452.14    10,851.36
                    7  INST. PROV. TOMACORRIENTES DOBLES C/PUESTA A TIERRA  pto  14.00  420.33    5,884.62
                    8  PROV. Y COLOC. LUMINARIA 1x40W FLUORESCENTE  pza        4.00     349.79    1,399.16